【Increasing the Output】Shortening Set Up Times

2014.12.01

“Digi-Peca” Saves Time When Changing Materials

When feeding materials to multiple injection machines, waste and lost time can occur when switching to n...

“Digi-Peca” Saves Time When Changing Materials
  • Shortening Set Up Times

2014.10.09

Shortening Set-Up Times during Material Changes

Shortening set up times can increase output, and reduce costs. Shorter setups save “time”, “energy...

Shortening Set-Up Times during Material Changes
  • Getting Rid of Wasted Energy
  • Getting Rid of Material Waste
  • Shortening Set Up Times

2014.04.16

Achieve Green Molding (8)

Maintenance work of gas-adhered metal molds is very troublesome. This time...

Achieve Green Molding (8)
  • Shortening Set Up Times
  • Cancelling Problems with Gas

PAGE TOP